Analysis of Economic Regulations of National Electrical Systems

Authors

  • Yusuf Suryanto Ministry of National Development Planning

DOI:

https://doi.org/10.36574/jpp.v1i1.8

Keywords:

Regulation, Electricity Policy, Energy

Abstract

The performance of the national electricity industry is inadequate. Improvements have so far ignored the highly centralized structure of the national electricity industry. Using the theory of industrial organization, comparative with developed countries, and considering the prevailing legal corridor, this paper recommends policy, in order to (i) create an un-centratious electricity system by establishing 5 electricity systems in Indonesia; (ii) continuing efforts to utilize shared networks Transmission (and distribution), and (iii) establishing the Electricity Industry Regulators. The main recommendation is to break-down the current PLN into 5 new electricity companies.

Downloads

Download data is not yet available.

Author Biography

Yusuf Suryanto, Ministry of National Development Planning

A Junior Planner at Directorate Energy, Telecommunication, and Information – Ministry of National
Development Planning/BAPPENAS.

Downloads

Published

2017-04-24

How to Cite

Yusuf Suryanto. (2017). Analysis of Economic Regulations of National Electrical Systems. Jurnal Perencanaan Pembangunan: The Indonesian Journal of Development Planning, 1(1), 46–58. https://doi.org/10.36574/jpp.v1i1.8

Issue

Section

Articles